Report Back to Projects
Proposed Borehole Approved

Jaldesa scheme

Marsabit · Saku · Jaldesa and Sangate

Overall Progress
0.00%
Project Overview
Implementing Agency
Water Sector Trust Fund
Programme
Horn of Africa -Ground Water for resillience Programme (HOAGWR)
Start Date
-
Planned End
-
Actual End
-
Contractor
-
Consultant
CAS
Location Type
Rural
Target Areas
Jaldesa and Sangate
Scope of Works
6No Solar Photovoltaic Pumping (PVP) System for Kamboe Midrock, Kamboe Furmasan, Lengisoro, Lesitima, Manyatta Ilgos and Jaldesa Boreholes Supply and installation of 59.816 km of various HDPE Pipeline sizes ranging from OD 50mm to 140mm and pressure rating Construction of separate community water point for livestock and domestic as given in the specifications. Construction/supply and installation of various sizes of Water Tank Ancillary Works -Construction of Administration buildings, Pump House Control room, guard house and sanitation facilities as
Impacts
To serve the estimated population. Specific to be updated
Remarks
Project at the design stage
GPS Coordinates
2.213235 38.16705
Funding Sources
Wb
🌍 Foreign · Loan
KES 28.0M
Total KES 28.0M
Beneficiaries
0
Households
1,521
Population
Technical Specs
Storage Reservoir 50.00 m³
Distribution Lines 5,350.00 km
Water Kiosks 3
Connections 10
Created 16 Aug 2026, 14:25 · Last updated 16 Aug 2026, 17:18