Proposed
Borehole
Approved
Laisamis Scheme
Marsabit · Laisamis · Laisamis
Overall Progress
0.00%
Project Overview
Implementing Agency
Water Sector Trust Fund
Programme
Horn of Africa -Ground Water for resillience Programme (HOAGWR)
Start Date
-
Planned End
-
Actual End
-
Contractor
-
Consultant
-
Location Type
Rural
Target Areas
Laisamis
Scope of Works
3No Solar Photovoltaic Pumping (PVP) System for Laisamis, Manyatta Lengima and Olturot Boreholes.
Supply and installation of 41.125 km of various HDPE Pipeline sizes ranging from OD 50mm to 150mm and pressure rating as detailed
Construction of separate community water point for livestock and domestic as given in the specifications.
Construction/supply and installation of various sizes of Water Tanks
Ancillary Works - Construction of Administration buildings, Pump House Control room, guard house and sanitation facilities as detailed
GPS Coordinates
1.572945
37.79163
Funding Sources
Wb
🌍 Foreign
· Loan
KES 46.8M
Total
KES 46.8M
Beneficiaries
0
Households
3,309
Population
Technical Specs
Storage Reservoir
200.00 m³
Distribution Lines
19.46 km
Water Kiosks
5
Connections
10
Created 16 Aug 2026, 14:25
· Last updated 16 Aug 2026, 17:18