Proposed Borehole Approved

Malabot scheme

Marsabit · North Horr · North Horr

Overall Progress
0.00%
Project Overview
Implementing Agency
Water Sector Trust Fund
Programme
Horn of Africa -Ground Water for resillience Programme (HOAGWR)
Start Date
-
Planned End
-
Actual End
-
Contractor
-
Consultant
CAS
Location Type
Rural
Target Areas
North-Horr
Scope of Works
5No Solar Photovoltaic Pumping (PVP) System for Malabot, Illeret, Marime, Golole and Gamura Boreholes. Supply and installation of 74.566 km of various HDPE Pipeline sizes ranging from OD 50mm to 110mm and pressure rating as detailed Construction of separate community water point for livestock and domestic use as given in the specifications Construction/supply and installation of various sizes of Water Tanks Ancillary Works -Construction of Administration buildings, Pump House Control room, guard house and sanitation facilities as detailed in the drawings Reverse osmosis Supply, install, test, commission and provide warranties, spares, and training of the operators and technicians, 12 months after sale-service for Reverse Osmosis systems, to Specifications and in proper working order for identified rural community covering a 20m3/hr Reverse osmosis system for Illeret Scheme; 14m3/hr Reverse Osmosis System for Golole Scheme.
Impacts
To serve the estimated population. Specific to be updated
Remarks
Project at the design stage
GPS Coordinates
3.14969 37.0989
Funding Sources
Wb
🌍 Foreign · Loan
KES 33.4M
Total KES 33.4M
Beneficiaries
273
Households
2,876
Population
Technical Specs
Storage Reservoir 150.00 m³
Distribution Lines 13.24 km
Water Kiosks 3
Connections 2