Proposed
Borehole
Approved
Golole scheme
Marsabit · Moyale · Uran
Overall Progress
0.00%
Project Overview
Implementing Agency
Water Sector Trust Fund
Programme
Horn of Africa -Ground Water for resillience Programme (HOAGWR)
Start Date
-
Planned End
-
Actual End
-
Contractor
-
Consultant
CAS
Location Type
Rural
Target Areas
Uran
Scope of Works
5No Solar Photovoltaic Pumping (PVP) System for Malabot, Illeret, Marime, Golole and Gamura Boreholes.
Supply and installation of 74.566 km of various HDPE Pipeline sizes ranging from OD 50mm to 110mm and pressure rating as detailed
Construction of separate community water point for livestock and domestic use as given in the specifications
Construction/supply and installation of various sizes of Water Tanks
Ancillary Works -Construction of Administration buildings, Pump House Control room, guard house and sanitation facilities as detailed in the drawings
Reverse osmosis Supply, install, test, commission and provide warranties, spares, and training of the operators and technicians, 12 months after sale-service for Reverse Osmosis systems, to Specifications and in proper working order for identified rural community covering a 20m3/hr Reverse osmosis system for Illeret Scheme; 14m3/hr Reverse Osmosis System for Golole Scheme.
Impacts
To serve the estimated population. Specific to be updated
Remarks
Project at the design stage
GPS Coordinates
3.601046
38.58893
Funding Sources
Wb
🌍 Foreign
· Loan
KES 52.9M
Total
KES 52.9M
Beneficiaries
0
Households
5,015
Population
Technical Specs
Storage Reservoir
100.00 m³
Distribution Lines
23.71 km
Water Kiosks
100
Connections
10