Proposed
Borehole
Approved
Lotubae
Turkana · Turkana East · Lokori/Kochodin
Overall Progress
0.00%
Project Overview
Implementing Agency
Water Sector Trust Fund
Programme
Horn of Africa -Ground Water for resillience Programme (HOAGWR)
Start Date
-
Planned End
-
Actual End
-
Contractor
-
Consultant
CAS
Location Type
Rural
Target Areas
Lokori/ kochodin
Scope of Works
6No Solar Photovoltaic Pumping (PVP) System for Lokwii Community, Lokwii Tullow, Nangolekuruk BH1, Nangolekuruk BH2 and Nangolekuruk BH2A Boreholes.
Supply and installation of 75.941Km of various HDPE Pipeline sizes ranging from OD 32mm to 150mm and pressure rating
iv. Construction of separate community water point for livestock and domestic use consisting of: • Water kiosks• Construction of Camel and Cattle Trough ,• Construction of Shoats Trough • Individual Connection
Construction/supply and installation of various sizes of Water Tanks
Ancillary Works -Construction of Administration buildings, Pump House Control room, guard house and sanitation facilities
Impacts
To serve the estimated population. Specific to be updated
Remarks
Project at the design stage
GPS Coordinates
2.0160067 36.1301423
Funding Sources
Wb
🌍 Foreign
· Loan
KES 45.0M
Total
KES 45.0M
Beneficiaries
0
Households
19,753
Population
Technical Specs
Storage Reservoir
500.00 m³
Distribution Lines
35.55 km
Water Kiosks
18
Connections
19
Created 16 Aug 2026, 14:25
· Last updated 16 Aug 2026, 17:18