Proposed
Borehole
Approved
KAITESE
Turkana · Loima · Turkwel
Overall Progress
0.00%
Project Overview
Implementing Agency
Water Sector Trust Fund
Programme
Horn of Africa -Ground Water for resillience Programme (HOAGWR)
Start Date
-
Planned End
-
Actual End
-
Contractor
-
Consultant
CAS
Location Type
Rural
Target Areas
Turkwel
Scope of Works
4No Solar Photovoltaic Pumping (PVP) System for Narimao Community, Kangakimak , Kaitese Community and Kaitese Catholic Boreholes.
Supply and installation of 32.857 Km of various HDPE Pipeline sizes ranging from OD 32mm to 140mm and the detailed pressure rating
ii. Construction of separate community water point for livestock and domestic use consisting of:
• Water kiosks,• Construction of Camel and Cattle Trough,• Construction of Shoats Trough • Individual Connection
Impacts
To serve the estimated population. Specific to be updated
Remarks
Project at the design stage
GPS Coordinates
3.016328 35.43985
Funding Sources
Wb
🌍 Foreign
· Loan
KES 43.2M
Total
KES 43.2M
Beneficiaries
0
Households
4,005
Population
Technical Specs
Storage Reservoir
300.00 m³
Distribution Lines
13.09 km
Water Kiosks
6
Connections
4
Created 16 Aug 2026, 14:25
· Last updated 16 Aug 2026, 17:18