Completed
Well field Water Supply
Approved
Naivasha Industrial Park Water supply Project
Narok · Narok East · Suswa
Overall Progress
100.00%
Project Overview
Implementing Agency
Central Rift Valley Water Works Development Agency
Programme
Naivasha Industrial Park Water supply Project
Start Date
-
Planned End
08 Jan 2021
Actual End
-
Contractor
China Civil Engineering Construction Corporation
Consultant
Wanjohi Mutonji Consultants Ltd
Location Type
Rural Urban
Target Areas
Naivasha Industrial Park ,Longonot Town and Suswa town
Scope of Works
•Driling of 5no boreholes
• Pumping main from NAIVAWASCO Borehole Site (Near Delamere) to the Main Tank at Longonot .
• Pumping main-22km-400mm diameter and Gravity main 28km -300mm- diameter
• 4,500m3 Reinforced Concrete Tank longonot
• 500m3 Reinforced Concrete Tank -booster to longonot
• 100m3 Reinforced Concrete Break Pressure Tank -BPT
• 2 No. 262m3 Elevated Steel Tanks
• Pump and Pump Houses
Impacts
Improve access to water
Key Challenges
No challenges during construction.
Narok Water Service Provider has reported vandalism and theft of Galvanised steel pipes
Remarks
Complete and operational and handed over to Naivasha Water and Sanitation Company. The Project was commissioned on 26th July, 2022
GPS Coordinates
-1.048068, 36.334585
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 995.4M
Total
KES 995.4M
Beneficiaries
3,000
Households
15,000
Population
Technical Specs
Volume Abstracted
10,000.00 m³/day
Storage Reservoir
5,624.00 m³
Treated Water Mains
50.00 km
Distribution Lines
20.00 km
Water Kiosks
2
Connections
200