Proposed
Sewerage System and water supply services
Approved
Lake Nakuru Biodiversity Conservation Project
Nakuru · Nakuru East · Nakuru East Ward
Overall Progress
0.00%
Project Overview
Implementing Agency
Central Rift Valley Water Works Development Agency
Programme
Lake Nakuru Biodiversity Conservation Project
Start Date
-
Planned End
-
Actual End
-
Contractor
-
Consultant
COWI A/S (Denmark) in cooperation with East African Engineering Consultants Limited (Kenya) as a sub-consultant
Location Type
Rural Urban
Target Areas
Nakuru Town, Njoro
Scope of Works
Lot 1: Construction of Njoro Wastewater Treatment Plant Lot 2: Upgrade of the Njoro treatment works and partial decommissioning of the Kaloleni Treatment works, Extension and rehabilitation of sewer network, Connections to the sewer for 18500 customers, Additional water supplies (12 new boreholes, Rehabilitation of Mereroni intake and pipeline to Treatment works, Rehabilitation of pipeline in Southern zone) and optimization of existing water supplies. Lot 3: Extension and rehabilitation of approximately 65km
sewer network including new sewer connections, construction of a wastewater pump station and a wastewater transfer station
consisting of a treatment facility and a transfer pump station. Rehabilitation of app. 10km of water pipelines in the Southern Zone of Nakuru.
Impacts
Improve access to water
Key Challenges
No challanges
Remarks
Prequalification of lot 1 (Construction of Njoro WWTP) finalized and shortlisted Contractors were informed. Shortlisted firms were supplied with tender documents to quote. Process ongoing.
Submission of bids for lots (Lot2 & 3 was done on 20th December 2024.Evaluation commenced 17th Jan 2025 currently ongoing.
Note:
Lot1-WWTP
Lot 2. Water Supply
Lot3. Sewer lines.
All relevant environmental related approvals have been acquired.
GPS Coordinates
-0.277396, 36.085774
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 950.0M
Kfw
🌍 Foreign
· Loan
KES 5,375.0M
Total
KES 6,325.0M
Beneficiaries
10,000
Households
50,000
Population
Technical Specs
Volume Abstracted
40,000.00 m³/day
Treatment Capacity
40,000.00 m³/day
Storage Reservoir
10,000.00 m³
Treated Water Mains
27.29 km
Distribution Lines
10.00 km
Wastewater Production Capacity
11,431.00 m³/day
Wastewater Treatment Capacity
11,431.00 m³/day
Trunk Sewer Main
12.80 km
Sewer Connections (Households)
3,700
Created 16 Aug 2026, 15:10
· Last updated 16 Aug 2026, 17:18