Completed
Spring
Approved
Liter Community Water Project
Elgeyo-Marakwet · Marakwet East · Embobut
Overall Progress
100.00%
Project Overview
Implementing Agency
North Rift Valley Water Works Developmnet Agency
Programme
Water Harvesting Programme
Start Date
08 Jul 2023
Planned End
04 Jul 2024
Actual End
-
Contractor
Talex Construction C0. Ltd
Consultant
-
Location Type
Rural
Target Areas
Liter Girls Secondary SChool
Liter Primary school
Karena and Kaben villages
Scope of Works
Construction of concrete weir and chamber
Construction of spring box and spring development
Construction of 2no. 100m3 masonry tanks
Laying of HDPE transmission and distribution lines of various sizes ranging from DN 32 to DN 75mm (14.4KM) Construction of communal water points and cattle troughs Repair of borehole
270 individual water connections
Impacts
Improved security status across the two communities
Improved acccess to water
Employment opportunities during construction of the project
Key Challenges
Insecurity challenges within the project area
Difficult Terrain
Remarks
Project succesfully implemented and fully operational
GPS Coordinates
latitudes 1.°17'02" N
longitudes
35° 37'09"
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 35.0M
Total
KES 35.0M
Beneficiaries
600
Households
3,000
Population
Technical Specs
Volume Abstracted
200.00 m³/day
Storage Reservoir
200.00 m³
Treated Water Mains
8.00 km
Distribution Lines
8.50 km
Water Kiosks
9
Connections
270
Non-Sewered Sanitation Facilities
1
Created 16 Aug 2026, 15:51