Ongoing
River Intake
Approved
Embomon Mogil Water Supply
Elgeyo-Marakwet · Marakwet East · Sambirir
Overall Progress
85.00%
Project Overview
Implementing Agency
North Rift Valley Water Works Developmnet Agency
Programme
North Rift Valley WWDA Projects
Start Date
-
Planned End
-
Actual End
-
Contractor
Warmoon Construction Company
Consultant
-
Location Type
Rural
Target Areas
Mogil and Kaptora Sub locations of Mon Location
Mogil Boarding Secondary School
Kaptora Boys Boarding School
Mogil Day Primary
Kapkein Boarding Pri School
Mogil ECDE
Kaptora ECDE
Kasar ECDE
Kantoror ECDE
Kapkein ECDE
Lower Sambirir ICT Centre
Scope of Works
Construction of intake
Construction of 2No. Masonry tanks at Kasar and Kantoror of capacities 50m3 and 100m3 respectively
Rehabilitation of 50m3 Korpaman Tank
Laying of 80/ 90mm gravity main in GI and HDPE 4km
Laying of distribution lines in sizes ranging OD 63mm – diameter 75mm - 6km
Impacts
Increased water coverage
Improved Quality of Life
Reduction in Waterborne Diseases
Better Hygiene and Sanitation
Increased Productivity
Community Cohesion
Reforestation and Soil Conservation
Key Challenges
Exisisting inter clan issues within the community which led to change of propsed intake site
Remarks
Interclan issues resolved andf the project is progressing well
GPS Coordinates
latitudes 1.°02'54.5" N
longitudes
35° 37'14"
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 35.0M
Total
KES 35.0M
Beneficiaries
360
Households
1,800
Population
Technical Specs
Volume Abstracted
480.00 m³/day
Storage Reservoir
200.00 m³
Treated Water Mains
4.00 km
Distribution Lines
6.00 km
Water Kiosks
4
Connections
50