Ongoing
River Intake
Approved
Kapyego Phase I
Elgeyo-Marakwet · Marakwet East · Kapyego
Overall Progress
33.00%
Project Overview
Implementing Agency
North Rift Valley Water Works Developmnet Agency
Programme
North Rift Valley WWDA Projects
Start Date
10 Aug 2024
Planned End
06 Aug 2025
Actual End
-
Contractor
Ascension East Africa Ltd
Consultant
-
Location Type
Rural
Target Areas
Kapyego and Kessom sub
locations of Kapyego location as well as Kararia sublocation in Kararia location
Kapyego ward
Scope of Works
Construction of new intake Weir, Construction of Gravity Main 18 Km length, Construction of 4 No. Storage Tanks total capacity 525m3 and laying 22km Distribution netwok
Impacts
Increased water coverage
Improved Quality of Life
Reduction in Waterborne Diseases
Better Hygiene and Sanitation
Increased Productivity
Community Cohesion
Reforestation and Soil Conservation
Key Challenges
No challenge
Remarks
Project on schedule
GPS Coordinates
latitudes 1.°08'51.78" N
longitudes
35° 28'42.46"
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 80.0M
Total
KES 80.0M
Beneficiaries
2,178
Households
9,798
Population
Technical Specs
Volume Abstracted
600.00 m³/day
Storage Reservoir
525.00 m³
Treated Water Mains
18.00 km
Distribution Lines
22.00 km
Connections
5