Completed
Dam
Approved
Soy Kosachei ( Nervillus) Water Project
Uasin Gishu · Turbo · Kamagut
Overall Progress
100.00%
Project Overview
Implementing Agency
North Rift Valley Water Works Developmnet Agency
Programme
North Rift Valley WWDA Projects
Start Date
07 Jun 2023
Planned End
03 Jun 2024
Actual End
12 Jun 2024
Contractor
-
Consultant
Professional Consultants Ltd
Location Type
Rural Urban
Target Areas
Kamagut/ Kosachei
Scope of Works
Embankment improvement & rehabilitation works for 700,000m3 earth dam; At least 3m dam embankment raising & downstream slope earth filling, grassing, dam crest road provision to 6m width, rip-rap protection on upstream slope, incorporation of a core trench, filter blanket, rock toe and toe drain.
Provision of a new main spillway; construct a 16.5m long concrete ogee weir positioned on the Left-Hand side of the embankment.
A new 350mm diameter, 650m long, steel gravity Raw Water Main from the intake to a new treatment works;
A new treatment works of capacity 6500 m3/d about 650 m from the intake at an elevation of about 1985m including two 1000m3 concrete ground clear water tanks, staff houses and laboratory;
New treated water pumped mains: 8.5 km, OD 315mm diameter HDPE pipeline from the new treatment works to a new elevated storage tank at Ngobitwa School and a 7km, OD 355mm HDPE pipe from the treatment works to a new elevated storage tank at Kamoret School;
2 No. new 500 m3 elevated steel tanks at Ngobitwa and at Kamoret, and a 150 m3 ground concrete tank and 100 m3 elevated steel tanks Kosachei.
New HDPE distribution mains from the elevated tanks at Ngobitwa and Kamoret schools varying in diameter from DN225 to DN63mm of total length 80km to serve the Soy, Kosachei and Kamagut schemes.
Impacts
Increased water coverage
Improved Quality of Life
Reduction in Waterborne Diseases
Better Hygiene and Sanitation
Increased Productivity
Community Cohesion
Reforestation and Soil Conservation
Reduced instances of water bornes diseases
Key Challenges
NIL
Remarks
Design phase complete
Approved for funding consideration under the National Urban Program
The resources required for implementation: Ksh. 1,7000,000,000.00
GPS Coordinates
latitudes 0°34'04.40" N
longitudes
35° 14'04.30"
Funding Sources
No funding sources recorded.
Total
KES 0.0M
Beneficiaries
7,230
Households
36,148
Population
Technical Specs
Storage Reservoir
750.00 m³
Treated Water Mains
7.00 km
Distribution Lines
43,260.00 km
Water Kiosks
6
Connections
1,000
Created 16 Aug 2026, 15:51