Ongoing
Borehole, Water Supply
Approved
Mukuru Kwa Reuben-Diamond Village
Nairobi · Embakasi South · Mukuru Kwa Reuben
Overall Progress
1.00%
Project Overview
Implementing Agency
Athi Water Works Development Agency
Programme
Drilling & Equipping of 6No. Boreholes and Construction of 3No. Elevated Steel Water Tanks with Associated Water Distribution Networks. Lot 1
Start Date
-
Planned End
-
Actual End
-
Contractor
Export Hydro Pump and Services (Africa) Limited
Consultant
-
Location Type
Urban
Target Areas
Mukuru Kwa Reuben
Scope of Works
Drilling, Equipping, Elevated tank, Water Kiosks & Associated Piping.
Remarks
Operational
GPS Coordinates
1.3182781,36.8710381
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 9.0M
Total
KES 9.0M
Beneficiaries
1,152
Households
5,760
Population
Technical Specs
Volume Abstracted
288.00 m³/day
Storage Reservoir
24.00 m³
Water Kiosks
1