Ongoing
Borehole, Water Supply
Approved
Heshima Primary in Bahati
Nairobi · Makadara · Bahati
Overall Progress
1.00%
Project Overview
Implementing Agency
Athi Water Works Development Agency
Programme
Drilling & Equipping of 7No. Boreholes and Construction of 4No. Elevated Steel Water Tanks with Associated Water Distribution Networks. Lot 4
Start Date
-
Planned End
-
Actual End
-
Contractor
Bavko Engineering Kenya LTD
Consultant
-
Location Type
Urban
Target Areas
Bahati
Scope of Works
Drilling, Equipping, Power Connection, 1No. Water Kiosks & Associated Piping, Elevated Tank
Key Challenges
Faulty motor and pump. Requires replacement
Remarks
Not Operational
GPS Coordinates
1.2920918,36.8491467
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 4.0M
Total
KES 4.0M
Beneficiaries
280
Households
1,400
Population
Technical Specs
Volume Abstracted
70.00 m³/day
Storage Reservoir
24.00 m³
Water Kiosks
1