Completed
Borehole
Approved
Water storage facility at Kituni Pri. Sch
Bungoma · Webuye West · Misikhu
Overall Progress
100.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
Lake Victoria North WWDA Projects.
Start Date
01 Mar 2024
Planned End
01 Sep 2024
Actual End
-
Contractor
Mukenya Stores Ltd
Consultant
-
Location Type
Rural
Target Areas
Kituni
Scope of Works
Borehole Drilling works
Finishing works for the borehole drilling
Equipping of the Borehole including installation of submersible pumping set powered by a hybrid of solar power system and capable connection to national electricity grid
Supply and installation of 30m3 elevated structurally pressed steel tank on 10m elevated steel tower
Construction of 4No Communal water points
Construction of 1 No normal water kiosk
Laying of 600m long HDPE pipeline
Impacts
Reduction in waterborne diseases due to access to clean water and improved sanitation, leading to better overall health and reduced healthcare costs. Increased school attendance especially for girls as they spend less time collecting water and managing sanitation needs. Access to clean water and sanitation will increase productivity in the workforce, leading to improved livelihoods and economic growth, women and girls often bear the burden of collecting water, so improved water access will empower them and provide more time for other activities
Key Challenges
Late disbursement of project funds
Remarks
Complete and opersational
GPS Coordinates
Latitude 0.6641946
Longitude 34.72808193
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 10.0M
Total
KES 10.0M
Beneficiaries
70
Households
1,500
Population
Technical Specs
Volume Abstracted
27.00 m³/day
Treatment Capacity
21.60 m³/day
Storage Reservoir
30.00 m³
Treated Water Mains
0.20 km
Distribution Lines
0.60 km
Water Kiosks
5
Connections
200
Wastewater Production Capacity
1,000.00 m³/day