Report Back to Projects
Ongoing Borehole Approved

Ndalu catholic Borehole

Bungoma · Tongaren · Ndalu

Overall Progress
80.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
Cross-County Programme
Start Date
-
Planned End
-
Actual End
-
Contractor
rulit company
Consultant
Nill
Location Type
Rural
Target Areas
Ndalu
Scope of Works
Installation of solar power hybrid system, solar flood light, and submersible pump supply and installation of 30m³ elevated structurally pressed steel tank on 10m steel tower rising main from the borehole to elevated tank (500m length) 40mm dia distribution line from the tank chamber (1600m long) hdpe 50mm-32mm dia construction of 4nr communal water points standard water kiosk
Impacts
Reduction in waterborne diseases due to access to clean water and improved sanitation, leading to better overall health and reduced healthcare costs. Increased school attendance especially for girls as they spend less time collecting water and managing sanitation needs. Access to clean water and sanitation will increase productivity in the workforce, leading to improved livelihoods and economic growth, women and girls often bear the burden of collecting water, so improved water access will empower them and provide more time for other activities
Key Challenges
Late disbursement of project funds which led to delays and limitations in scope.
Remarks
Ongoing project, almost complete
GPS Coordinates
Latitude : 0.79563 Longitude 34.4837890
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 10.0M
Total KES 10.0M
Beneficiaries
100
Households
500
Population
Technical Specs
Volume Abstracted 50.40 m³/day
Treatment Capacity 28.80 m³/day
Storage Reservoir 10.00 m³
Treated Water Mains 0.10 km
Distribution Lines 0.50 km
Water Kiosks 4
Connections 10
Created 16 Aug 2026, 15:51