Ongoing
Borehole
Approved
Kapsengere Borehole Water Project
Nandi · Aldai · Terik
Overall Progress
95.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
National Harvesting and Ground Water Exploration
Start Date
10 Dec 2024
Planned End
-
Actual End
-
Contractor
Dardec Ventures ltd
Consultant
l
Location Type
Rural
Scope of Works
Installation of solar power hybrid system, solar flood light, and submersible pump
supply and installation of 30m³ elevated structurally pressed steel tank on 10m steel tower
rising main from the borehole to elevated tank (500m length) 40mm dia
distribution line from the tank chamber (1600m long) hdpe 50mm-32mm dia
construction of 4nr communal water points
standard water kiosk
Impacts
Reduction in waterborne diseases due to access to clean water and improved sanitation, leading to better overall health and reduced healthcare costs. Increased school attendance especially for girls as they spend less time collecting water and managing sanitation needs. Access to clean water and sanitation will increase productivity in the workforce, leading to improved livelihoods and economic growth, women and girls often bear the burden of collecting water, so improved water access will empower them and provide more time for other activities
Key Challenges
Insufficient budget allocation and late disbursement of project funds which led to delays and limitations in scope.
Remarks
Project is progressing well and almost complete
GPS Coordinates
Latitude -0.011436°
Longitude 34.757761°
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 8.0M
Total
KES 8.0M
Beneficiaries
250
Households
1,000
Population
Technical Specs
Volume Abstracted
68.00 m³/day
Treatment Capacity
59.00 m³/day
Storage Reservoir
30.00 m³
Treated Water Mains
0.20 km
Distribution Lines
0.60 km
Water Kiosks
1
Created 16 Aug 2026, 15:51
· Last updated 16 Aug 2026, 17:19