Report Back to Projects
Ongoing Borehole Approved

Kamonjil Primary School Water Project

Nandi · Chesumei · Kosirai

Overall Progress
90.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
Water Harvesting Programme
Start Date
-
Planned End
-
Actual End
-
Contractor
Upwork Enterprises Limited
Consultant
-
Location Type
Rural
Target Areas
Kamonjil
Scope of Works
1.Preliminaries and General Items. 2.Installation of solar power hybrid system and submersible pump. 3.Rising main from the borehole to elevated tank (130m length) 40mm dia. 4.Distribution line from the tank chamber (270m long) 40mm dia. 5.Construction of 4nr communal water points.
Impacts
Increased school attendance especially for students as they spend less time collecting water. Access to clean water and has increased their productivity and provided more time for other educational activities. There has been reduction in waterborne diseases due to access to clean water and improved sanitation, leading to better overall health and reduced healthcare costs.
Key Challenges
Insufficient budget allocation which led to delays and limitations in scope and late disbursement of funds
Remarks
The project is complete and operational
GPS Coordinates
Latitude: 0.211828986 Longitude: 35.1491442
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 10.0M
Total KES 10.0M
Beneficiaries
200
Households
800
Population
Technical Specs
Volume Abstracted 65.60 m³/day
Treatment Capacity 65.60 m³/day
Storage Reservoir 30.00 m³
Treated Water Mains 0.13 km
Distribution Lines 0.27 km
Water Kiosks 4
Created 16 Aug 2026, 15:51
County Overview
Loading…
Loading…

Fetching entity performance details…