Report Back to Projects
Ongoing Borehole Approved

(Nandi TTI (Sigilai Water Project )

Nandi · Nandi Hills · Ol’lessos

Overall Progress
91.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
Water for Schools
Start Date
-
Planned End
-
Actual End
-
Contractor
Chestev Construction Limited
Consultant
-
Location Type
Rural
Target Areas
Sigilai
Scope of Works
Drilling,Installation of solar power hybrid system floodlight and submersible pump Supply and installation of 18m³ elevated structurally pressed steel tank on 10m steel tower Rising main from the borehole to elevated tank (20m length) 50mm dia Distribution line from the tank chamber to cwps (180m long 50mm dia) Construction of 3nr communal water points
Impacts
Reduction in waterborne diseases due to access to clean water and improved sanitation, leading to better overall health and reduced healthcare costs. Increased school attendance especially for girls as they spend less time collecting water and managing sanitation needs. Access to clean water and sanitation will increase productivity in the workforce, leading to improved livelihoods and economic growth, women and girls often bear the burden of collecting water, so improved water access will empower them and provide more time for other activities
Key Challenges
Insufficient budget allocation which led to delays and limitations in scope and late disbursement of funds
Remarks
Almost complete
GPS Coordinates
Latitude 0.193739947 Longitude 35.33518016
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 7.0M
Total KES 7.0M
Beneficiaries
375
Households
1,500
Population
Technical Specs
Volume Abstracted 25.20 m³/day
Treatment Capacity 20.16 m³/day
Storage Reservoir 18.00 m³
Treated Water Mains 0.02 km
Distribution Lines 0.18 km
Water Kiosks 5
Created 16 Aug 2026, 15:51 · Last updated 16 Aug 2026, 17:19