Ongoing
Borehole
Approved
St mary Teresia school
Nandi · Mosop · Chepterwai
Overall Progress
10.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
Cross-County Programme
Start Date
-
Planned End
-
Actual End
-
Contractor
Winteam International ltd
Consultant
-
Location Type
Rural
Target Areas
Chepterwai
Scope of Works
Installation of solar power hybrid system and submersible pump
Supply and installation of 30m³ elevated structurally pressed steel tank on 10m steel tower
Rising main from the borehole to the elevated tank (100m length 50mm dia)
Distribution line from the tank chamber to school cwps (110m long 50mm dia)
Construction of 2 nr communal water points
Impacts
Reduction in waterborne diseases due to access to clean water and improved sanitation, leading to better overall health and reduced healthcare costs. Increased school attendance especially for girls as they spend less time collecting water and managing sanitation needs. Access to clean water and sanitation will increase productivity in the workforce, leading to improved livelihoods and economic growth, women and girls often bear the burden of collecting water, so improved water access will empower them and provide more time for other activities
Key Challenges
Insufficient budget allocation which led to delays and limitations in scope and late disbursement of funds
Remarks
Almost complete
GPS Coordinates
Latitude : 0.506925190
Longitude 34.929116853
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 8.0M
Total
KES 8.0M
Beneficiaries
375
Households
1,500
Population
Technical Specs
Volume Abstracted
81.00 m³/day
Treatment Capacity
64.80 m³/day
Storage Reservoir
30.00 m³
Treated Water Mains
0.10 km
Distribution Lines
0.10 km
Water Kiosks
2