Proposed
Borehole
Approved
Mbakalo Water Project
Bungoma · Tongaren · Mbakalo
Overall Progress
0.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
Lake Victoria North WWDA Projects.
Start Date
-
Planned End
-
Actual End
-
Contractor
-
Consultant
-
Location Type
Rural
Target Areas
Mbakalo B
Scope of Works
Rehabilitation of the spring
Construction of 5om3 Masonly sump
Rehabilitation and augmentation of solar and electromechanical works
Construction of 100m3 Elevated pressed steel tank
Laying of rising main and distribution pipelines approximately 2Km long
construction of 2No Water Kiosk
construction of 4No.Communal water point
Impacts
There will be reduction in waterborne diseases due to access to clean water leading to better overall health and reduced healthcare costs. There will be increased school attendance especially for girls as they spend less time collecting water. Access to clean water will increase productivity in the workforce, leading to improved livelihoods and economic growth, women and girls often bear the burden of collecting water, so improved water access will empower them and provide more time for other activities
Key Challenges
The allocated amount(KES 5,000,000) is not enough to Complete the project
Remarks
The project requires an additional amount of 25,000,000 (Twenty-five Million Kenya shillings) for it to complete operational and serve the required target area
GPS Coordinates
Latitude 0.72105598
Longitude 35.0045087
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 5.0M
Total
KES 5.0M
Beneficiaries
750
Households
3,000
Population
Technical Specs
Volume Abstracted
180.00 m³/day
Treatment Capacity
144.00 m³/day
Storage Reservoir
150.00 m³
Treated Water Mains
0.50 km
Distribution Lines
1.50 km
Water Kiosks
6
Connections
50