Proposed
Borehole
Approved
Lwenya Irrigation Scheme
Kakamega · Ikolomani · Idakho East
Overall Progress
0.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
Lake Victoria North WWDA Projects.
Start Date
-
Planned End
-
Actual End
-
Contractor
Kantex General Trading Ltd
Consultant
-
Location Type
Rural
Scope of Works
Installation of solar power hybrid system and submersible pump
Installation of 30m3 (30,000litres) pressed elevated steel tank on 8m steel tower
Rising main from the borehole to elevated tank(30 long) 40mm diameter hdpe pipes
Distribution pipeline from the tank to kiosk-cwps-kitchen-nursery bed(200 long) 40mm dia
Construction of normal water kiosk at school gate
Construction of 3nr communal water points
Irrigation system
Impacts
Reduction in waterborne diseases due to access to clean water and improved sanitation, leading to better overall health and reduced healthcare costs. Increased school attendance especially for girls as they spend less time collecting water and managing sanitation needs. Access to clean water and sanitation will increase productivity in the workforce, leading to improved livelihoods and economic growth, women and girls often bear the burden of collecting water, so improved water access will empower them and provide more time for other activities
GPS Coordinates
Latitude : 0.15686645
Longitude 34.81352839
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 10.0M
Total
KES 10.0M
Beneficiaries
300
Households
1,200
Population
Technical Specs
Volume Abstracted
63.00 m³/day
Treatment Capacity
50.40 m³/day
Storage Reservoir
30.00 m³
Treated Water Mains
0.03 km
Distribution Lines
0.20 km
Water Kiosks
1
Connections
1