Proposed Borehole Approved

Lwenya Irrigation Scheme

Kakamega · Ikolomani · Idakho East

Overall Progress
0.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
Lake Victoria North WWDA Projects.
Start Date
-
Planned End
-
Actual End
-
Contractor
Kantex General Trading Ltd
Consultant
-
Location Type
Rural
Scope of Works
Installation of solar power hybrid system and submersible pump Installation of 30m3 (30,000litres) pressed elevated steel tank on 8m steel tower Rising main from the borehole to elevated tank(30 long) 40mm diameter hdpe pipes Distribution pipeline from the tank to kiosk-cwps-kitchen-nursery bed(200 long) 40mm dia Construction of normal water kiosk at school gate Construction of 3nr communal water points Irrigation system
Impacts
Reduction in waterborne diseases due to access to clean water and improved sanitation, leading to better overall health and reduced healthcare costs. Increased school attendance especially for girls as they spend less time collecting water and managing sanitation needs. Access to clean water and sanitation will increase productivity in the workforce, leading to improved livelihoods and economic growth, women and girls often bear the burden of collecting water, so improved water access will empower them and provide more time for other activities
GPS Coordinates
Latitude : 0.15686645 Longitude 34.81352839
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 10.0M
Total KES 10.0M
Beneficiaries
300
Households
1,200
Population
Technical Specs
Volume Abstracted 63.00 m³/day
Treatment Capacity 50.40 m³/day
Storage Reservoir 30.00 m³
Treated Water Mains 0.03 km
Distribution Lines 0.20 km
Water Kiosks 1
Connections 1