Ivonda Primary School Water Project

Kakamega · Ikolomani · Idakho

Overall Progress
10.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
Cross-County Programme
Start Date
-
Planned End
-
Actual End
-
Contractor
Candletech Enterprise ltd
Consultant
-
Location Type
Rural
Target Areas
Ivonda
Scope of Works
Borehole camera scanning, flushing and test-pumping, installation of submersible pump and solar hybrid system Installation of submersible pump and solar hybrid system Supply and installation of 30m³ elevated structurally pressed steel tank Tank on 10m steel tower" Rising main to elevated steel tank Distribution to primary section, secondary section cwps and water kiosk Normal water kiosk Construction of 4 no. communal water points
Impacts
Waterborne diseases will reduce due to access to clean water leading to better overall health and reduced healthcare costs. There will be increased school attendance especially for girls as they will spend less time collecting water. Access to clean water will empower benefeciries and provide more time for other activities.
GPS Coordinates
Latitude 0.1494511 Longitude 34.75539923
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 10.0M
Total KES 10.0M
Beneficiaries
150
Households
600
Population
Technical Specs
Volume Abstracted 144.00 m³/day
Treatment Capacity 115.20 m³/day
Storage Reservoir 30.00 m³
Treated Water Mains 0.01 km
Distribution Lines 0.40 km
Water Kiosks 5