Ongoing
Borehole
Approved
Ivonda Primary School Water Project
Kakamega · Ikolomani · Idakho
Overall Progress
10.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
Cross-County Programme
Start Date
-
Planned End
-
Actual End
-
Contractor
Candletech Enterprise ltd
Consultant
-
Location Type
Rural
Target Areas
Ivonda
Scope of Works
Borehole camera scanning, flushing and test-pumping, installation of submersible pump and solar hybrid system
Installation of submersible pump and solar hybrid system
Supply and installation of 30m³ elevated structurally pressed steel tank
Tank on 10m steel tower"
Rising main to elevated steel tank
Distribution to primary section, secondary section cwps and water kiosk
Normal water kiosk
Construction of 4 no. communal water points
Impacts
Waterborne diseases will reduce due to access to clean water leading to better overall health and reduced healthcare costs. There will be increased school attendance especially for girls as they will spend less time collecting water. Access to clean water will empower benefeciries and provide more time for other activities.
GPS Coordinates
Latitude 0.1494511
Longitude 34.75539923
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 10.0M
Total
KES 10.0M
Beneficiaries
150
Households
600
Population
Technical Specs
Volume Abstracted
144.00 m³/day
Treatment Capacity
115.20 m³/day
Storage Reservoir
30.00 m³
Treated Water Mains
0.01 km
Distribution Lines
0.40 km
Water Kiosks
5