Report Back to Projects
Ongoing Borehole Approved

Iluya Primary School Water Project

Kakamega · Ikolomani · Idakho East

Overall Progress
10.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
Cross-County Programme
Start Date
-
Planned End
-
Actual End
-
Contractor
Claluss enterprise ltd
Consultant
-
Location Type
Rural
Target Areas
Iluya
Scope of Works
Drilling,Installation of submersible pump and solar hybrid system Installation of 30m3 (30,000litres) pressed elevated steel tank on 10m steel tower Rising main to elevated steel tank Distribution to primary section, ECDsection CWP and water kiosks Water kiosk Construction of 3 no. communal water points
Impacts
Waterborne diseases will reduce due to access to clean water leading to better overall health and reduced healthcare costs. There will be increased school attendance especially for girls as they will spend less time collecting water. Access to clean water will empower benefeciries and provide more time for other activities.
GPS Coordinates
Latitude 0.16946675 Longitude 34.733093977
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 10.0M
Total KES 10.0M
Beneficiaries
200
Households
800
Population
Technical Specs
Volume Abstracted 126.00 m³/day
Treatment Capacity 100.80 m³/day
Storage Reservoir 30.00 m³
Treated Water Mains 0.05 km
Distribution Lines 0.30 km
Water Kiosks 4
Connections 2
Created 16 Aug 2026, 15:51
County Overview
Loading…
Loading…

Fetching entity performance details…