Ebusiralo Primary School Borehole water Project
Vihiga · Luanda · Luanda Township
Overall Progress
10.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
Cross-County Programme
Start Date
-
Planned End
-
Actual End
-
Contractor
Cedar General Company Limited
Consultant
-
Location Type
Rural
Target Areas
Ebusiralo
Scope of Works
Drilling, Installation of solar power hybrid system and submersible pump
Installation of 30m3 (30,000litres) pressed elevated steel tank on 10m steel tower
Rising main from the borehole to elevated tank (150 long) 40mm diameter HDPE pipes
Distribution pipeline from the tank to primary CWP(150 long) 40mm dia
Distribution pipeline to tvet-cdc-church-(300 long) 40mm dia
Construction of 3nr communal water points and standpipe ( 2no. at primary,1no. at tvet and standpipe at church)
Impacts
Waterborne diseases will reduce due to access to clean water leading to better overall health and reduced healthcare costs. There will be increased school attendance especially for girls as they will spend less time collecting water. Access to clean water will empower benefeciries and provide more time for other activities.
GPS Coordinates
Latitude 0.0232708447
Longitude 34.60705698
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 8.0M
Total
KES 8.0M
Beneficiaries
250
Households
1,000
Population
Technical Specs
Volume Abstracted
63.00 m³/day
Treatment Capacity
50.40 m³/day
Storage Reservoir
30.00 m³
Treated Water Mains
0.15 km
Distribution Lines
0.45 km
Water Kiosks
3
Connections
3