Ongoing
Canal Intake
Approved
Kitui-matuu lastmile connectivity (Matuu water supply project)
Machakos · Yatta · Ndalani, Matuu, Kithimani, Ikombe and Katangi.
Overall Progress
38.00%
Project Overview
Implementing Agency
Tanathi Water Works Development Agency
Programme
Kenya Towns Sustainable Water Supply and Sanitation Program (KTSWSSP)
Start Date
03 Nov 2020
Planned End
-
Actual End
-
Contractor
BMK
Consultant
Saman Corporation JV Tertiary Consulting Engineers
Location Type
Urban
Target Areas
Matuu town
Scope of Works
• Intake chamber
• Raw water gravity main of 77m
• New water treatment plant of capacity 4,000m3/day.
• Treated water rising main of 1.1km.
• Steel elevated tank of 108m3.
• Transmission line of 28.9km.
• Construction of 225 ground RC tank.
• Distribution line of 30km.
• 1,500 No. consumer water connections.
• Solar power farm for the T-works
• Fencing and other auxiliary works for the treatment plant.
Impacts
The project upon completion will serve the target area with clean, safe, and affordable water
Key Challenges
Poor performance by the contractor
Remarks
Works contractor terminated due to contractor non-perfomance
GPS Coordinates
37.54466316361135
-1.142705364379708
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 47.5M
Adb
🌍 Foreign
· Loan
KES 297.1M
Total
KES 344.6M
Beneficiaries
1,000
Households
5,000
Population
Technical Specs
Volume Abstracted
4,000.00 m³/day
Treatment Capacity
4,000.00 m³/day
Storage Reservoir
333.00 m³
Treated Water Mains
28.90 km
Distribution Lines
30.00 km
Water Kiosks
7
Connections
1,000