Chepchor Water Pan

Elgeyo-Marakwet · Marakwet East · Endo

Overall Progress
100.00%
Project Overview
Implementing Agency
North Rift Valley Water Works Developmnet Agency
Programme
Post-Covid 19 Economic Stimulus Program
Start Date
07 May 2021
Planned End
-
Actual End
-
Contractor
-
Consultant
-
Location Type
Rural
Scope of Works
Construction of water pan capacity 20,000m3 with related works.
Impacts
The Water Pan is serving a total of 330 Households and 20,000 livestock within the Kerio Valley.
GPS Coordinates
Latitude 1° 5'57.78"N Longtitude 35°38'25.88"E
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 10.0M
Total KES 10.0M