Report Back to Projects
Completed Spring Approved

Liter Community Water Project

Elgeyo-Marakwet · Marakwet East · Embobut

Overall Progress
100.00%
Project Overview
Implementing Agency
North Rift Valley Water Works Developmnet Agency
Programme
Water Harvesting Program
Start Date
08 Jul 2023
Planned End
04 Jul 2024
Actual End
-
Contractor
Talex Construction C0. Ltd
Consultant
-
Location Type
Rural
Target Areas
Liter Girls Secondary SChool Liter Primary school Karena and Kaben villages
Scope of Works
Construction of concrete weir and chamber Construction of spring box and spring development Construction of 2no. 100m3 masonry tanks Laying of HDPE transmission and distribution lines of various sizes ranging from DN 32 to DN 75mm (14.4KM) Construction of communal water points and cattle troughs Repair of borehole 270 individual water connections
Impacts
Improved security status across the two communities Improved acccess to water Employment opportunities during construction of the project
Key Challenges
Insecurity challenges within the project area Difficult Terrain
Remarks
Project succesfully implemented and fully operational
GPS Coordinates
latitudes 1.°17'02" N longitudes 35° 37'09"
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 35.0M
Total KES 35.0M
Beneficiaries
600
Households
3,000
Population
Technical Specs
Volume Abstracted 200.00 m³/day
Storage Reservoir 200.00 m³
Treated Water Mains 8.00 km
Distribution Lines 8.50 km
Water Kiosks 9
Connections 270
Non-Sewered Sanitation Facilities 1