Report Back to Projects
Proposed Water Supply Approved

Maron Sibow Project

Elgeyo-Marakwet · Marakwet East · Embobut/ Embolot Endo

Overall Progress
0.00%
Project Overview
Implementing Agency
North Rift Valley Water Works Developmnet Agency
Programme
GOK Funded Projects
Start Date
-
Planned End
-
Actual End
-
Contractor
-
Consultant
-
Location Type
Rural
Target Areas
Mokoro and Kibiriem locations
Scope of Works
Construction of new intake Weir, Construction of Gravity Main 14 Km length OD 250, OD 110 - 16 km Distribution netwok, Construction of 8 No. Break Pressure Tanks and 12no. VIP Toilets
Impacts
Increased water coverage Improved Quality of Life Reduction in Waterborne Diseases Better Hygiene and Sanitation Increased Productivity Community Cohesion Reforestation and Soil Conservation
Key Challenges
Timely dirbursement of funds
Remarks
Project scheduled for commencement in March 2025
GPS Coordinates
latitudes 1.°12'23.35" N longitudes 35° 37'03.80"
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 300.0M
Total KES 300.0M
Beneficiaries
1,660
Households
8,279
Population
Technical Specs
Volume Abstracted 13,000.00 m³/day
Treated Water Mains 14.00 km
Distribution Lines 16.00 km
Created 16 Aug 2026, 17:18