Ongoing
Borehole, Water Supply
Approved
Riruta Health Centre
Nairobi · Dagoretti North · Riruta
Overall Progress
1.00%
Project Overview
Implementing Agency
Athi Water Works Development Agency
Programme
Drilling and equipping, solarization and construction of elevated water tanks with Associated distribution networks.
Start Date
-
Planned End
-
Actual End
-
Contractor
Export Hydro Pump and Services (Africa) Limited
Consultant
-
Location Type
Urban
Target Areas
Riruta
Scope of Works
Drilling, Equipping, Power Connection, Water Kiosks & Associated Piping, Elevated Tank
Remarks
Operational
GPS Coordinates
1.2867902,36.7416332
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 7.1M
Total
KES 7.1M
Beneficiaries
912
Households
4,560
Population
Technical Specs
Volume Abstracted
228.00 m³/day
Storage Reservoir
24.00 m³
Water Kiosks
1
Created 16 Aug 2026, 17:18