Ongoing
Borehole, Water Supply
Approved
Ruai Chiefs camp
Nairobi · Embakasi Central · Ruai
Overall Progress
1.00%
Project Overview
Implementing Agency
Athi Water Works Development Agency
Programme
Drilling and equipping, solarization and construction of elevated water tanks with Associated distribution networks.
Start Date
-
Planned End
-
Actual End
-
Contractor
Spirit MVS (PTY) Ltd
Consultant
-
Location Type
Urban
Target Areas
Ruai
Scope of Works
Drilling, Equipping, Power Connection, Water Kiosks & Associated Piping, Elevated Tank
Key Challenges
Faulty motor and pump. Requires replacement
Remarks
Not operational
GPS Coordinates
1.2662332,36.9502873
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 4.0M
Total
KES 4.0M
Beneficiaries
504
Households
2,520
Population
Technical Specs
Volume Abstracted
126.00 m³/day
Storage Reservoir
24.00 m³
Water Kiosks
1