Report Back to Projects
Ongoing Borehole, Water Supply Approved

Kenya Union of the Blind - Kabansora

Nairobi · Embakasi South · Embakasi

Overall Progress
1.00%
Project Overview
Implementing Agency
Athi Water Works Development Agency
Programme
Drilling and equipping, solarization and construction of elevated water tanks with Associated distribution networks.
Start Date
-
Planned End
-
Actual End
-
Contractor
Spirit MVS (PTY) Ltd
Consultant
-
Location Type
Urban
Target Areas
Embakasi
Scope of Works
Drilling, Equipping, Power Connection, Water Kiosks & Associated Piping, Elevated Tank
Remarks
Operational
GPS Coordinates
1.3175954,36.9075245
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 3.8M
Total KES 3.8M
Beneficiaries
480
Households
2,400
Population
Technical Specs
Volume Abstracted 120.00 m³/day
Storage Reservoir 24.00 m³
Water Kiosks 1