Ongoing Borehole, Water Supply Approved

St teresa boys Eastleigh

Nairobi · Kamukunji · Airbase

Overall Progress
1.00%
Project Overview
Implementing Agency
Athi Water Works Development Agency
Programme
Drilling and equipping, solarization and construction of elevated water tanks with Associated distribution networks.
Start Date
-
Planned End
-
Actual End
-
Contractor
Bavko Engineering Kenya LTD
Consultant
-
Location Type
Urban
Target Areas
Airbase
Scope of Works
Drilling, Equipping, Power Connection, Water Kiosks & Associated Piping, Elevated Tank
Key Challenges
Faulty motor and pump. Requires replacement
Remarks
Not Operational
GPS Coordinates
1.2691551,36.8480848
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 6.8M
Total KES 6.8M
Beneficiaries
480
Households
2,400
Population
Technical Specs
Volume Abstracted 120.00 m³/day
Storage Reservoir 24.00 m³
Water Kiosks 1