Proposed
Water Supply
Approved
Central Bunyore LMC Water Project
Vihiga · Emuhaya · Central Bunyore Ward
Overall Progress
0.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
GOK Funded Projects
Start Date
-
Planned End
-
Actual End
-
Contractor
Nuram Consultants ltd
Consultant
-
Location Type
Rural
Target Areas
Esinaka
Scope of Works
Rehabilitation Of 2no. 100m3 Masonry Sumps
Electromechanical Works and Fencing Works
Rising Main from The Pump House to Masonry Tank and Steel Tank (2000m Length) 110mm Dia HDPE
Rehabilitation Of 1nr. Masonry 150m3 Tank And 1nr. 50m3 Elevated Steel Tank
Return Line to Esirulo Dispensary 600m Length (OD 50mm Diameter HDPE)
Construction Of 1no.Normal Water Kiosk at Esirulo Market
Construction Of 5nr Communal Water Points
Line To Esirulo Primary/Secondary/ Isanda Primary 1500m Length (OD 90mm-OD 63 Mm Diameter HDPE)
Line To Esirulo Market 1300m Length (OD 140mm-63mm Diameter HDPE)
Line To Mwiyavo Market 700m Length (OD 50mm Diameter HDPE)
Line To Ikalikha Primary 1000m Length (OD 63mm Diameter HDPE)
Impacts
Reduction in waterborne diseases due to access to clean water and improved sanitation, leading to better overall health and reduced healthcare costs. Increased school attendance especially for girls as they spend less time collecting water and managing sanitation needs. Access to clean water and sanitation will increase productivity in the workforce, leading to improved livelihoods and economic growth, women and girls often bear the burden of collecting water, so improved water access will empower them and provide more time for other activities
Key Challenges
No challenges yet
Remarks
Contractor has mobilised resources and ready to commence works.
GPS Coordinates
Latitude 0.11289
Longitude 34.59427893
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 15.0M
Total
KES 15.0M
Beneficiaries
1,275
Households
5,100
Population
Technical Specs
Volume Abstracted
400.00 m³/day
Treatment Capacity
400.00 m³/day
Storage Reservoir
200.00 m³
Treated Water Mains
2.00 km
Distribution Lines
5.10 km
Water Kiosks
6
Created 16 Aug 2026, 17:19