Ongoing Borehole Approved

Kunurter Primary School Borehole

Nandi · Chesumei · Kosirai

Overall Progress
70.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
Water Harvesting Program
Start Date
01 Sep 2023
Planned End
01 Jan 2024
Actual End
-
Contractor
Puritec Logistics
Consultant
-
Location Type
Rural
Target Areas
Kunurter
Scope of Works
Installation of solar power hybrid system and submersible pump Supply and installation of 30m³ elevated structurally pressed steel tank on 10m steel tower Rising main from the borehole to elevated tank (300m length) 50mm dia Distribution line from the tank chamber (650m long) 50mm dia Construction of 3nr communal water points
Impacts
Reduction in waterborne diseases due to access to clean water and improved sanitation, leading to better overall health and reduced healthcare costs. Increased school attendance especially for girls as they spend less time collecting water and managing sanitation needs. Access to clean water and sanitation will increase productivity in the workforce, leading to improved livelihoods and economic growth, women and girls often bear the burden of collecting water, so improved water access will empower them and provide more time for other activities
Key Challenges
Insufficient budget allocation and late disbursement of project funds which led to delays
Remarks
Slow progress
GPS Coordinates
Latitude 0.218874094 Longitude 35.13338752
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 10.0M
Total KES 10.0M
Beneficiaries
400
Households
1,600
Population
Technical Specs
Volume Abstracted 64.00 m³/day
Treatment Capacity 64.00 m³/day
Storage Reservoir 30.00 m³
Treated Water Mains 0.30 km
Distribution Lines 65.00 km
Water Kiosks 3