Report Back to Projects
Ongoing Borehole Approved

AIC Tabongenik Primary School Borehole

Nandi · Chesumei · Kosirai

Overall Progress
98.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
Water Harvesting Program
Start Date
-
Planned End
-
Actual End
-
Contractor
Upwork Enterprises Limited
Consultant
-
Location Type
Rural
Target Areas
Tabongenik
Scope of Works
1.Preliminaries and General Items. 2.Supply and installation of 30m3 elevated structurally pressed steel tank on 10m elevated steel tower.
Impacts
Increased school attendance especially for students as they spend less time collecting water. Access to clean water and has increased their productivity and provided more time for other educational activities. There has been reduction in waterborne diseases due to access to clean water and improved sanitation, leading to better overall health and reduced healthcare costs.
Key Challenges
Late disbursement of funds
Remarks
The project is complete and operational
GPS Coordinates
Latitude 0.225825992 Longitude 35.155944899
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 10.0M
Total KES 10.0M
Beneficiaries
150
Households
600
Population
Technical Specs
Volume Abstracted 171.20 m³/day
Treatment Capacity 171.20 m³/day
Storage Reservoir 30.00 m³
Treated Water Mains 0.05 km
Distribution Lines 0.70 km
Water Kiosks 3
Connections 10
Created 16 Aug 2026, 17:19
County Overview