Proposed
Water Supply
Approved
Water storage facility at Kimalewa Pri.
Bungoma · Kabuchai · Mukuyuni
Overall Progress
0.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
GOK Funded Projects
Start Date
-
Planned End
-
Actual End
-
Contractor
-
Consultant
-
Location Type
Rural
Scope of Works
Gravity line to masonry tank 200m length (100mm dia)
100m3 masonry tank
Kibis distribution line 1500m length (100mm-32mm dia)
Wetangula school distribution lines 2000m length (100mm-32mm dia)
Communal water point (cwp)
Impacts
Reduction in waterborne diseases due to access to clean water and improved sanitation, leading to better overall health and reduced healthcare costs. Increased school attendance especially for girls as they spend less time collecting water and managing sanitation needs. Access to clean water and sanitation will increase productivity in the workforce, leading to improved livelihoods and economic growth, women and girls often bear the burden of collecting water, so improved water access will empower them and provide more time for other activities
Key Challenges
delayed disbursement of funds
Remarks
Awaiting disbursment of funds to advertise for construction works
GPS Coordinates
Latitude 0.78500706
Longitude 34.6408719
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 10.0M
Total
KES 10.0M
Technical Specs
Volume Abstracted
100.00 m³/day
Treatment Capacity
100.00 m³/day
Storage Reservoir
100.00 m³
Treated Water Mains
0.20 km
Distribution Lines
3.50 km
Water Kiosks
4
Connections
300
Wastewater Production Capacity
1,500.00 m³/day