Siaya Bondo Sewer Project

Siaya · Bondo · Nyawita and Barkowino

Overall Progress
1.00%
Project Overview
Implementing Agency
Lake Victoria South Water Works Development Agency
Programme
SMALL TOWNS RURAL WATER SUPPLY AND SANITATION PROJECT
Start Date
-
Planned End
-
Actual End
-
Contractor
Jiangxi Hydropower Limited.
Consultant
Wapcos Ltd
Location Type
Rural Urban
Target Areas
Bondo Town
Scope of Works
• Inlet Chamber including coarse and fine screen chambers • Sullage channel with parshall flume • Distribution chamber • 2 No. Anaerobic ponds • 1 No. Facultative pond • 2 No. Maturation ponds . • 15.1 km precast concrete sewer lines of diameters 300mm to 225mm in Bondo town. • 4 No. public ablution blocks.
Impacts
Improved health and socioeconomic wellbeing of the population
Key Challenges
Delayed payment to contractor due to delayed exchequer releases
Remarks
Project Complete and operational
GPS Coordinates
0°04'23.4"N 34°15'03.6"E
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 216.4M
Adb
🌍 Foreign · Loan
KES 24.0M
Total KES 240.4M
Beneficiaries
6,600
Households
33,000
Population
Technical Specs
Connections 130
Wastewater Production Capacity 4,515.00 m³/day
Wastewater Treatment Capacity 4,515.00 m³/day
Trunk Sewer Main 15.10 km
Reticulation Sewer 5.00 km
Manholes 160
Non-Sewered Sanitation Facilities 4
Sewer Connections (Households) 130