Ongoing Water Supply, Approved

Emmergency Works

Kisumu · Kisumu Central · Nyalenda B

Overall Progress
1.00%
Project Overview
Implementing Agency
Lake Victoria South Water Works Development Agency
Programme
Kisumu Water & Sanitation Program
Start Date
-
Planned End
-
Actual End
02 Jan 2011
Contractor
Rapido
Consultant
Seureca East Africa Ltd. in JV with SEURECA Consulting Engineers
Location Type
Urban
Target Areas
Dunga Intake, Water Treatment Plant
Scope of Works
1Km DN 500 raw water main from Dunga intake to Dunga T-works Two flow series of WTW with total capacity of 24,00m3/day comprising inlet works, mixing chamber, sedimentation tanks, rapid gravity sand filters, chemical building and contact tank 1,400m3 Supply and installation of pumps 2No. 540m3/hr low lift pumps & 2No. 540m3/hr high lift pumps
Impacts
Increased water production Increased access to water supply
Key Challenges
Undeperformance of contractor
Remarks
Completed and handed over to KIWASCO
GPS Coordinates
0° 7'17.83"S 34°44'46.55"E
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 10.6M
Afd
🌍 Foreign · Loan
KES 105.9M
Total KES 116.4M
Beneficiaries
10,000
Households
100,000
Population
Technical Specs
Volume Abstracted 24,000.00 m³/day
Treatment Capacity 24,000.00 m³/day
Storage Reservoir 1,400.00 m³
Connections 10,000