Report Back to Projects
Ongoing Water Supply, Approved

LTAP Works Package 1

Kisumu · Kisumu Central · Kondele,Migosi/

Overall Progress
1.00%
Project Overview
Implementing Agency
Lake Victoria South Water Works Development Agency
Programme
Kisumu Water & Sanitation Program
Start Date
-
Planned End
-
Actual End
-
Contractor
Zhonghao Overseas Construction Engineering Company Limited
Consultant
Seureca East Africa Ltd. in JV with SEURECA Consulting Engineers
Location Type
Urban
Target Areas
Kondele, Nyalenda B
Scope of Works
Supply and laying 28km pipelines btw DN90 & DN700 Supply of 2km OD110 Supply and installation of 8 No. bulk meters including 2 No. portable ultrasonic flow meters Construction of reinforced concrete ground level reservoirs with total storage capacity of 8400m3 Supply of 6,560 consumer water meters 79m2 workshop at Dunga T-works
Impacts
Increased water production Increased access to water supply
Key Challenges
Wayleave acquisition Slow GoK disbursement
Remarks
Completed and handed over to KIWASCO
GPS Coordinates
0° 5'16.98"S 34°46'2.40"E
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 48.8M
Afd
🌍 Foreign · Loan
KES 487.6M
Total KES 536.3M
Beneficiaries
5,000
Households
40,000
Population
Technical Specs
Storage Reservoir 8,400.00 m³
Treated Water Mains 5.00 km
Distribution Lines 33.00 km
Connections 5,000
Created 16 Aug 2026, 17:19 · Last updated 16 Aug 2026, 17:19