Ongoing
Water Supply,
Approved
LTAP Works Package 1
Kisumu · Kisumu Central · Kondele,Migosi/
Overall Progress
1.00%
Project Overview
Implementing Agency
Lake Victoria South Water Works Development Agency
Programme
Kisumu Water & Sanitation Program
Start Date
-
Planned End
-
Actual End
-
Contractor
Zhonghao Overseas Construction Engineering Company Limited
Consultant
Seureca East Africa Ltd. in JV with SEURECA Consulting Engineers
Location Type
Urban
Target Areas
Kondele, Nyalenda B
Scope of Works
Supply and laying 28km pipelines btw DN90 & DN700
Supply of 2km OD110
Supply and installation of 8 No. bulk meters including 2 No. portable ultrasonic flow meters
Construction of reinforced concrete ground level reservoirs with total storage capacity of 8400m3
Supply of 6,560 consumer water meters
79m2 workshop at Dunga T-works
Impacts
Increased water production
Increased access to water supply
Key Challenges
Wayleave acquisition
Slow GoK disbursement
Remarks
Completed and handed over to KIWASCO
GPS Coordinates
0° 5'16.98"S
34°46'2.40"E
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 48.8M
Afd
🌍 Foreign
· Loan
KES 487.6M
Total
KES 536.3M
Beneficiaries
5,000
Households
40,000
Population
Technical Specs
Storage Reservoir
8,400.00 m³
Treated Water Mains
5.00 km
Distribution Lines
33.00 km
Connections
5,000