Ongoing
Sanitation, Water supply
Approved
Works Package 1: Water and Wastewater Network Works
Kisumu · Kisumu East · Manyatta 'B'
Overall Progress
75.00%
Project Overview
Implementing Agency
Lake Victoria South Water Works Development Agency
Programme
Lake Victoria Water and Sanitation (LVWATSAN) Program
Start Date
01 Dec 2022
Planned End
-
Actual End
-
Contractor
Zhonghao Overseas Construction Engineering Company Limited
Consultant
BRL/SCET Tunisie/ISEP
Location Type
Urban
Target Areas
Nyamsaria, RingRoad Milimani, Auji
Scope of Works
3 km of Water Network Works
13km of Wastewater Networks (diameters ranging from 0D 200 to OD 600) including 800 Manholes
Construction of Pumping Station next to the Nairobi Interchange
700 Public Sewer Connections (up to Connection Boxes)
350 Private Sewer Connections to be done by Nominated Sub Contractor
Impacts
Improved water quality at L.Victoria due to reduced pollution
Key Challenges
1. Slow implementation of RAP due to the slow disbursement of GoK funds.
2. Exchange rate fluctuations that necessitated an addendum to the contract sum to include financial contingency
3. Constricted wayleaves in most of the sections since the works focus on Kisumu City
Remarks
Works ongoing . The contractor has since been paid the balance of the foreign currency component prsented by exchange rate flactuations
GPS Coordinates
0° 5'24.89"S
34°46'55.05"E
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 24.1M
Afd
🌍 Foreign
· Loan
KES 86.9M
Eib
🌍 Foreign
· Loan
KES 154.5M
Total
KES 265.6M
Beneficiaries
10,000
Households
100,000
Population
Technical Specs
Distribution Lines
3.00 km
Trunk Sewer Main
3.00 km
Reticulation Sewer
9.50 km
Manholes
230
Sewer Connections (Households)
1,050
Created 16 Aug 2026, 17:19