Proposed
Sanitation
Approved
Works Package 3: Otonglo Waste Water Treatemebt Plant and Network
Kisumu · Kisumu West · West Kisumu
Overall Progress
0.00%
Project Overview
Implementing Agency
Lake Victoria South Water Works Development Agency
Programme
Lake Victoria Water and Sanitation (LVWATSAN) Program
Start Date
05 Mar 2026
Planned End
-
Actual End
-
Contractor
Feasibility Study Ongoing
Consultant
Artelia & Mangat
Location Type
Rural Urban
Target Areas
Otonglo
Scope of Works
Construction of Wate Water Treatment Plant
Laying 70Km waste water network
3 Lifting Stations
Impacts
Increased sewer coverage
Reduced pollution of Lake Victoria
Reduced incidences of cholera
Key Challenges
community resistance to the sanitation project
Remarks
Feasibility Studies Ongoing
GPS Coordinates
0° 6'21.11"S
34°39'27.76"E
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 231.2M
Afd
🌍 Foreign
· Loan
KES 832.3M
Eib
🌍 Foreign
· Loan
KES 1,479.7M
Total
KES 2,543.2M
Beneficiaries
40,000
Households
200,000
Population
Technical Specs
Wastewater Production Capacity
5,000.00 m³/day
Reticulation Sewer
70.00 km
Manholes
450
Non-Sewered Sanitation Facilities
10
Sewer Connections (Households)
10,000