Ongoing
Unknown
Approved
Consulting Services for the Preparation of Detailed Designs and Tender Documents, Assistance to PEA in Tendering and Contracting and and Construction Supervision
Kericho · Ainamoi · Kapkugerwet, Ainamoi, Kipchimchim, Kipchebor, Kapsoit, Kapsaos
Overall Progress
5.00%
Project Overview
Implementing Agency
Lake Victoria South Water Works Development Agency
Programme
Support to Wastewater Management at Lake Victoria South
Start Date
09 May 2024
Planned End
11 Jan 2028
Actual End
-
Contractor
-
Consultant
CES/MIBP
Location Type
Rural Urban
Target Areas
Kapkugerwet, Ainamoi, Kipchimchim, Kipchebor, Kapsoit, Kapsaos
Scope of Works
Replacement of old, dilapidated sewers and undersized sewers, 7 km (200- 450 mm dia.) • Expansion of the existing sewer network a. 35 km (200mm Diameter) sewer lines b. 1,800 No. plot connections • Rehabilitation and Upgrading of existing WWTP (capacity extension from 660 m³/d in 2019 to 3,500 m³/d in 2026) • O&M Equipment including repairs of existing exhausters. Replacement of 62.4 km DN 15 to 225 old & dilapidated water pipelines
• 9,970 No. (replacement: 7,926 and new: 1,994) consumer and bulk water meters with
diameters ranging from 15mm to 250mm.
Expansion of Ainamoi Water Network, 4.8 km water pipelines with diameters varying in
size from 32mm to 110mm, and 500 new water connections. Additional water distribution pipelines, 5.6 km in Kericho urban/peri-urban areas.
Impacts
Improved sanitation; Improved hygiene; Reduced water-borne diseases; Increased coverage to portable piped water supply
Key Challenges
Frequent blockages in sewers due to solid waste deposition in sewer chambers (Poor management of solid wate); Sewer lines passing through private lands & properties; Encroachment of sewer wayleaves in some areas; Existing sewer lines that have not been connected to clients
Remarks
Project ongoing smoothly; Works Contract expected to be signed before January 2026
GPS Coordinates
0°22'14.44"S, 35°16'32.21"E
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 12.3M
Total
KES 12.3M
Beneficiaries
9,000
Households
45,000
Population
Technical Specs
Distribution Lines
62.40 km
Connections
9,970
Wastewater Production Capacity
3,500.00 m³/day
Wastewater Treatment Capacity
3,500.00 m³/day
Trunk Sewer Main
7.00 km
Reticulation Sewer
35.00 km
Manholes
500
Sewer Connections (Households)
1,800