Ongoing
Ablution Blocks
Approved
Construction of 15 No. Ablution Blocks in Mombasa County
- · - · -
Overall Progress
78.00%
Project Overview
Implementing Agency
State Department for Water and Sanitation
Programme
Water & Sanitation Development Project (WSDP)
Start Date
10 Apr 2021
Planned End
-
Actual End
-
Contractor
Timar Construction Limited
Consultant
Batch Associates Ltd JV Tertiary Consulting Engineers Ltd
Location Type
-
Scope of Works
15 nr ablution blocks for Ladies and Gents, each with 3No. Doors and an extra door specially designed for PWD, Personnel office, elevated tank and shower, septic tank, walkways and storm drainage system.
Funding Sources
Wb
🌍 Foreign
· Loan
KES 49.1M
Total
KES 49.1M
Beneficiaries
1,000
Households
5,000
Population
Technical Specs
Volume Abstracted
2.00 m³/day
Created 16 Aug 2026, 17:19