Report Back to Projects
Proposed WTP/Pipeline Approved

Design and Construction of Mwache Water Treatment Plant, Transmission Mains, Terminal Reservoirs, Distribution and Sanitation Works

- · - · -

Overall Progress
0.00%
Project Overview
Implementing Agency
Coast Water Works Development Agency
Programme
Improvement of drinking water in mombasa
Start Date
-
Planned End
-
Actual End
-
Contractor
-
Consultant
-
Location Type
Rural Urban
Scope of Works
186,000 m3 Treatment plant, 65 km ranging between 700-1200 mm epoxy coated steel pipes, 4 terminal reseviors, Distribution Networks and Sanitation Systems.
Remarks
Detailed designs ready/ Procurement of contractor ongoing.
Funding Sources

No funding sources recorded.

Total KES 0.0M
Beneficiaries
8,000
Households
40,000
Population
Technical Specs
Volume Abstracted 186,000.00 m³/day
Treatment Capacity 186,000.00 m³/day
Storage Reservoir 98,000.00 m³
Treated Water Mains 58.00 km