| Start Date | 2022-06-04 |
| Planned End Date | 2023-06-04 |
| Actual End Date | N/A |
| Contractor | Maxfol, Aquawet ltd, Kendi limited |
| Consultant | None |
| Target Areas | Kapkwen |
| Scope of Works | • Construction of 1no closed kiosk
• Construction of 1no. insitu yard taps
• 161 no. Cold Water Consumer meters
• 9.4 km Pipeline extension
• Construction of 1 no. 108 m3 elevated steel tank
• 75m3/hr Discharge Electric Pump set |
| Impacts | The project will improve water access for 5,408 people through a 9.4 km pipeline extension, 161 cold water consumer meters for efficient distribution, a 108m³ elevated steel tank for reliable storage, a 75m³/hr discharge electric pump set to enhance supply, and the construction of a closed kiosk and an in-situ yard tap for improved public access. |
| Challenges | Slow release GOK funds, Slow pace of construction |
| Remarks | N/A |