Project Detail Report
| Status | Proposed |
|---|---|
| Type | Borehole |
| Agency | Water Sector Trust Fund |
| Program | Horn of Africa -Ground Water for resillience Programme (HOAGWR) |
| Progress | 0.00% |
| County | Marsabit |
|---|---|
| Constituency | Laisamis |
| Ward | Loglogo |
| Setting | Rural |
| Coordinates | 1.990437, 37.912224 |
| Start Date | N/A |
|---|---|
| Planned End Date | N/A |
| Actual End Date | N/A |
| Contractor | N/A |
| Consultant | N/A |
| Target Areas | Gudas,Lbarok,Loglogo |
| Scope of Works | 6No Solar Photovoltaic Pumping (PVP) System for Kamboe Midrock, Kamboe Furmasan, Lengisoro, Lesitima, Manyatta Ilgos and Jaldesa Boreholes Supply and installation of 59.816 km of various HDPE Pipeline sizes ranging from OD 50mm to 140mm and pressure rating Construction of separate community water point for livestock and domestic as given in the specifications. Construction/supply and installation of various sizes of Water Tank Ancillary Works -Construction of Administration buildings, Pump House Control room, guard house and sanitation facilities as |
| Impacts | N/A |
| Challenges | N/A |
| Remarks | Project at the design stage |
| Total Contract Sum (GoK + Foreign) | KES 101,000,719.30 |
|---|---|
| GoK Contract Sum | KES 0.00 |
| Foreign Contract Sum | KES 101,000,719.30 |
| Cumulative Expenditure | KES 0.00 |
| Outstanding Cost | KES 0.00 |
| Source | Type | Amount (KES) |
|---|---|---|
| Wb | Loan | 101,000,719.30 |
| Target Households | 0 |
|---|---|
| Target Population | 5,485 |