Project Detail Report
| Status | Proposed |
|---|---|
| Type | Borehole |
| Agency | Water Sector Trust Fund |
| Program | Horn of Africa -Ground Water for resillience Programme (HOAGWR) |
| Progress | 0.00% |
| County | Marsabit |
|---|---|
| Constituency | Laisamis |
| Ward | Loiyangalani |
| Setting | Rural |
| Coordinates | 2.592309, 37.085020 |
| Start Date | N/A |
|---|---|
| Planned End Date | N/A |
| Actual End Date | N/A |
| Contractor | N/A |
| Consultant | CAS |
| Target Areas | olturot |
| Scope of Works | 3No Solar Photovoltaic Pumping (PVP) System for Laisamis, Manyatta Lengima and Olturot Boreholes. Supply and installation of 41.125 km of various HDPE Pipeline sizes ranging from OD 50mm to 150mm and pressure rating as detailed Construction of separate community water point for livestock and domestic as given in the specifications. Construction/supply and installation of various sizes of Water Tanks Ancillary Works - Construction of Administration buildings, Pump House Control room, guard house and sanitation facilities as detailed |
| Impacts | To serve the estimated population. Specific to be updated |
| Challenges | N/A |
| Remarks | Project at the design stage |
| Total Contract Sum (GoK + Foreign) | KES 31,488,365.17 |
|---|---|
| GoK Contract Sum | KES 0.00 |
| Foreign Contract Sum | KES 31,488,365.17 |
| Cumulative Expenditure | KES 0.00 |
| Outstanding Cost | KES 0.00 |
| Source | Type | Amount (KES) |
|---|---|---|
| Wb | Loan | 31,488,365.17 |
| Target Households | 0 |
|---|---|
| Target Population | 2,227 |