Illeret scheme

Project Detail Report

Overview

StatusProposed
TypeBorehole
AgencyWater Sector Trust Fund
ProgramHorn of Africa -Ground Water for resillience Programme (HOAGWR)
Progress0.00%

Location Information

CountyMarsabit
ConstituencyNorth Horr
Ward Illeret
SettingRural
Coordinates4.314178, 36.228400

Timeline & Impact

Start DateN/A
Planned End DateN/A
Actual End DateN/A
ContractorN/A
ConsultantCAS
Target AreasIlleret
Scope of Works5No Solar Photovoltaic Pumping (PVP) System for Malabot, Illeret, Marime, Golole and Gamura Boreholes. Supply and installation of 74.566 km of various HDPE Pipeline sizes ranging from OD 50mm to 110mm and pressure rating as detailed Construction of separate community water point for livestock and domestic use as given in the specifications Construction/supply and installation of various sizes of Water Tanks Ancillary Works -Construction of Administration buildings, Pump House Control room, guard house and sanitation facilities as detailed in the drawings Reverse osmosis Supply, install, test, commission and provide warranties, spares, and training of the operators and technicians, 12 months after sale-service for Reverse Osmosis systems, to Specifications and in proper working order for identified rural community covering a 20m3/hr Reverse osmosis system for Illeret Scheme; 14m3/hr Reverse Osmosis System for Golole Scheme.
ImpactsTo serve the estimated population. Specific to be updated
ChallengesN/A
RemarksProject at the design stage

Project Cost

Total Contract Sum (GoK + Foreign)KES 52,510,614.52
GoK Contract SumKES 0.00
Foreign Contract SumKES 52,510,614.52
Cumulative ExpenditureKES 0.00
Outstanding CostKES 0.00

Funding Sources

SourceTypeAmount (KES)
Wb Loan 52,510,614.52

Beneficiaries

Target Households1,376
Target Population20,230