Project Detail Report
| Status | Proposed |
|---|---|
| Type | Borehole |
| Agency | Water Sector Trust Fund |
| Program | Horn of Africa -Ground Water for resillience Programme (HOAGWR) |
| Progress | 0.00% |
| County | Turkana |
|---|---|
| Constituency | Turkana South |
| Ward | Katilu |
| Setting | Rural |
| Coordinates | 2.516334, 35.407352 |
| Start Date | N/A |
|---|---|
| Planned End Date | N/A |
| Actual End Date | N/A |
| Contractor | N/A |
| Consultant | CAS |
| Target Areas | Katilu ,Kanaodon |
| Scope of Works | 4No Solar Photovoltaic Pumping (PVP) System for Narimao Community, Kangakimak , Kaitese Community and Kaitese Catholic Boreholes. Supply and installation of 32.857 Km of various HDPE Pipeline sizes ranging from OD 32mm to 140mm and the detailed pressure rating ii. Construction of separate community water point for livestock and domestic use consisting of: • Water kiosks,• Construction of Camel and Cattle Trough,• Construction of Shoats Trough • Individual Connection |
| Impacts | To serve the estimated population. Specific to be updated |
| Challenges | N/A |
| Remarks | Project at the design stage |
| Total Contract Sum (GoK + Foreign) | KES 22,223,947.22 |
|---|---|
| GoK Contract Sum | KES 0.00 |
| Foreign Contract Sum | KES 22,223,947.22 |
| Cumulative Expenditure | KES 0.00 |
| Outstanding Cost | KES 0.00 |
| Source | Type | Amount (KES) |
|---|---|---|
| Wb | Loan | 22,223,947.22 |
| Target Households | 0 |
|---|---|
| Target Population | 914 |